The use requirements and correct operation methods of tall space warm and warm units are as follows:
Requirements:
1. Temperature setting: The temperature setting should not be too high, generally higher set at 25 degrees.Because the hot air will generate gradient effects in the high space, the temperature may increase by 1 degree every 1 meter up, so it should be avoided that the high temperature should cause energy waste and heat loss.
2. Do not switch the group at will: Frequent switches may affect the service life and heating effect of the unit.
3. House insulation: As the wall thermal insulation performance of tall space buildings may be poor, pay attention to improving the insulation performance of the building, reducing cold wind penetration to improve the heating effect.
4. Safety protection: When running the unit, do not cover the equipment, do not put the equipment in a place with water or possibly water, let alone put it in a flammable and explosive environment to ensure safety.
5. Equipment maintenance: It should be managed by professionals, check the operation regularly, and discover abnormal processing in time.After one month of running, you should check whether the various connected firmware is loose, and it should be adjusted in time if there is any timely.After two years of operation, comprehensive inspections, maintenance and maintenance should be performed.
Operation correctly:
1. Preparation before opening: Check whether the power supply, water, water, and air circuit are normal. It is only after confirmation.
2. Set temperature: Set reasonable temperature values ??according to actual needs to avoid excessive or low temperatures cause damage to equipment and the human body.
3. Operating mode selection: Select the appropriate operating mode according to the season and indoor temperature, such as cooling, heating, and air supply.
4. Regular cleaning the filter: During the operation of the unit, the dust and impurities in the air may be attached to the filter to affect the air circulation and heating effect.Therefore, regular cleaning filters need to be kept smooth.
5. Maintenance after shutting down: After the unit is turned off, the power should be cut off and the surface of the body should be cleaned to extend the service life of the unit.
Please note that the above is just general requirements and operation methods. The specific operation should be performed according to the actual situation and product manual.

Related News
Read More >>
Pipe connection method of air Pipe connection method of air
06 .18.2024
Air suspension fans are efficient, environmentally friendly ventilation equipmen
Installation and debugging of Installation and debugging of
06 .18.2024
Before installation: Before installation, first prepare the materials and tools
Advantages and adjustment meth Advantages and adjustment meth
06 .18.2024
A centrifugal fan is a mechanical device that relies on input mechanical energy
How to debug a centrifugal cur How to debug a centrifugal cur
06 .30.2024
The debugging of the centrifugal curtain machine mainly includes the following s

Leave Your Message