WEX side wall installation method 1. Read the instruction manual and product samples, the specifications, forms, leaf rotation directions, and airflow entry and exit direction of familiar and understanding; check whether each component is intact, otherwise it should be installed after repair.2. When installation of the WEX side wall, there must be a safety device to prevent accidents and be installed and wiring by professionals who are familiar with relevant safety requirements.3. There is a separate support that connects the exit, and the pipeline is not allowed to overlap the weight of the pipeline to the components; the horizontal position that should be paid attention to during installation should be adjusted to the connection with the foundation with the foundation.Connect.4. After installation of the WEX side wall, use your hands or leverage to move the impeller to check whether there is too tight or rubbing. There are no items that hinder the rotation.There should be a protective cover (the users own), if the air inlet does not take over the pipe, the protective network or other installation devices should also be added.5. The power control box of the WEX wall must match the corresponding match (referring to power, voltage, pneumatic method, control form, etc.).6. The WEX side wall wiring should be wiring by professional electrical engineers, and the wiring must be correct and reliable, especially the wiring number at the electrical control box corresponds to the number on the wiring column.Essence7. After all the WEX front walls are installed, check whether there are internal tool box debris WEX front wall maintenance methods 1.WEX wall wall use environment should be kept neat, the surface is kept clean, and the air outlet should not have debris.Regularly eliminate dust and other miscellaneous objects in the tube.2. It can only be operated under the condition of a complete positive gear. At the same time, it is necessary to maintain sufficient power supply facilities and stable voltage. It is strictly forbidden to operate the lack of phase. The power supply line must be a line.3. During the operation of the WEX front wall, there are abnormal sounds, severe fever of the motor, charging of the shell, switching, and unable to start. It should be immediately stopped for inspection.To ensure safety, maintenance is not allowed during operation.After the maintenance, the trial operation should be carried out for about five minutes to confirm that there is no abnormal phenomenon before starting.4. Replenish or replace the lubricating oil according to the environmental conditions of the use of the use environment (motor closed bearing does not need to replace lubricating oil during the service life period)., Close bearing and motor bearing, refueling the ZL -3 lithium -based lubricating oil to fill the bearing inner and outer circles of the bearing.It is strictly forbidden to operate oil.5.Wexs wall should be stored in a dry environment to avoid moisture.When stored in the open air, there should be rain prevention measures.Storage and handling should be prevented from bumps, so as not to be damaged.

Related News
Read More >>
Pipe connection method of air Pipe connection method of air
06 .18.2024
Air suspension fans are efficient, environmentally friendly ventilation equipmen
Installation and debugging of Installation and debugging of
06 .18.2024
Before installation: Before installation, first prepare the materials and tools
Advantages and adjustment meth Advantages and adjustment meth
06 .18.2024
A centrifugal fan is a mechanical device that relies on input mechanical energy
How to debug a centrifugal cur How to debug a centrifugal cur
06 .30.2024
The debugging of the centrifugal curtain machine mainly includes the following s