Color pavement construction process introducti

Views : 699
Update time : 2024-06-24

1. Arrive at the construction site: According to the construction requirements, arrive at the construction site on time or early.
2. Setting safety measures: According to factors such as pavement width and traffic flow, the construction scope of safety facilities such as traffic signs, traffic cone, roadbar, and alert belt is used.Equipped with transportation administrators, wearing shoulder stones, sirens, red flags, pay attention to vehicles and pedestrians to ensure the safety of construction personnel.
3. Clean road surface: Use a polished machine, wire brush, and broom to thoroughly remove dust, moisture, and oil stains on the road. Then use the cleaning machine to thoroughly clean the ground. After the ground is dry, apply base oil on the construction floor.
4. Paste the adhesive adhesive paper and mixing paint: After the ground is clean, the bomb line is performed according to the construction requirements, and the rubber paper is pasted according to the standard of the bomb line;
5. Primer: Put the coating that is stirred evenly on the road with a scraper tool (using a scraper or a scraper)
6. Sprinkle osteophyte: Sprinkle evenly before the bottom coat is not dry

Related News
Read More >>
Pipe connection method of air Pipe connection method of air
06 .18.2024
Air suspension fans are efficient, environmentally friendly ventilation equipmen
Installation and debugging of Installation and debugging of
06 .18.2024
Before installation: Before installation, first prepare the materials and tools
Advantages and adjustment meth Advantages and adjustment meth
06 .18.2024
A centrifugal fan is a mechanical device that relies on input mechanical energy
How to debug a centrifugal cur How to debug a centrifugal cur
06 .30.2024
The debugging of the centrifugal curtain machine mainly includes the following s

Leave Your Message


TOP