Welcome to Kena Environmental Technology Co., LTD

Frozen air replacement machine and installation method

Views :
Update time : 2024-06-30

In order to improve the quality of indoor air, more and more people choose to install a fresh air to replace the gas at home, and many people do not particularly understand the fresh air ventilation, including its installation steps.In order to solve everyones doubts, I will introduce the installation steps for fresh air replacement machines in detail.
When the wall -mounted fresh air air conversion machine is installed, it is necessary to punch the wall to fix the unit on the wall.Because the air -changing machine needs to be exchanged for indoor and outdoor air, a larger ventilation hole needs to be opened on the wall.When installing, it is generally drawn on the wall and punch.
The installation process is as follows:
1. Determine the installation pipeline and air outlet to first pick up the new wind host electricity line from the switch box, communicate with the home improvement construction personnel, and determine the location of the pipeline and air outlet.After the position is determined, install the pipeline system and install a suspension card every 150 cm in the hard pipe. The pipeline requires horizontally and vertical.Install a hanging card at 70 cm, and the suspension bolts are used with long bolts.
2. When installing the air inlet and the host at the installation of the air outlet, pay attention to the position of the air outlet. The lower air outlet must be flat with the ceiling.In the air outlet, the host must be installed horizontally on the top of the house, as close to the hall close to the air inlet.The second step is the connection between the pipeline and the host. The pipeline and the host enter the exhaust port. Use a variable diameter or funnel -type head, and fix it with tin foil cloth with tin foil cloth at the joint seam.
3. After the installation is completed, check the host and the pipe system installation, and communicate with the home improvement and electrician to determine the location of the new wind switch installation.
After the fresh air gas exchange driver runs for a long time, its outlet will absorb dust in the air due to static electricity. These dusts flying can easily breed bacteria in the air outlet, affecting beauty and health requirements.Therefore, the fresh air system requires professionals to regularly clean the air outlet and filter.Cleaning requires a special cleaner to avoid blocking and affect the efficiency of gas supply and exhaust.For the long -term use of fresh fans, the terminal of the wiring board may be loose due to the vibration of the new fan, which may cause hidden safety hazards.It is necessary to regularly check by professionals and resolve hidden safety hazards in a timely manner.
The above is about the installation steps of fresh air replacement machines. I hope that the above content can be helpful to everyone. Thank you for your watching and support. In the later period, more information will be sorted out for everyone. Please pay more attention to us-

Related News
Read More >>
Pipe connection method of air Pipe connection method of air
06 .18.2024
Air suspension fans are efficient, environmentally friendly ventilation equipmen
Installation and debugging of Installation and debugging of
06 .18.2024
Before installation: Before installation, first prepare the materials and tools
Advantages and adjustment meth Advantages and adjustment meth
06 .18.2024
A centrifugal fan is a mechanical device that relies on input mechanical energy
How to debug a centrifugal cur How to debug a centrifugal cur
06 .30.2024
The debugging of the centrifugal curtain machine mainly includes the following s

Leave Your Message