The main control parameters of the vertical combination air conditioning unit are rated air volume, noise, rated refrigeration volume, rated heat, etc.
Treatment function:
The air treatment function section of the crew is: air mixed, balanced, filtration, cooling, first and secondary heating, de -dampness, humidification, supply of air supply, ventilation fan, refuses, water spraying, sounding, heat recovery, and other units.
It is mainly suitable for the air purification system of various cleaning plants.Such as industrial electronics factories, precision machinery manufacturers, textile workshops, GMP pharmaceutical factories, cosmetics, food factories, pure water workshops, hospital surgery department, ICU and other occasions.
Construction installation points
1. The combined air -conditioning unit can be installed on the base of the concrete platform or the type of steel.The height from the ground should ensure that the condensation water is discharged smoothly.There should be a drainage ditch (tube) and floor drain to eliminate condensate water and put water on the bottom of the air -conditioning machine.
2. On -site assembly air -conditioning units should be paid attention to:
1) Sealing four corners and bottom plates of the unit;
2) The quality of sealing materials.
3. Check the cooling section and the lower part of the dripping section of the spray section before installation.
4. Check whether the thickness of the insulation layer of the unit meets the requirements, whether the pavement of the thermal insulation material is uniform, and whether the cold bridge appears at the connection between each functional section to prevent the shell from exposed.
5. Check whether the insulation materials of the unit meet the fire prevention requirements. The insulation material should be difficult or non -combustible materials, and the approval certificate of the competent fire protection department shall have a certificate of approval.
After the unit is installed, check whether the wind speed distribution on the section should be evenly distributed.Whether there is water with water after the cooling disk or water spraying section.Try to avoid the emergence of this phenomenon.
The above is the introduction and construction attention of the vertical combination air -conditioning unit