Environmental protection vertical remote air -conditioning units have a wide range of application areas.In large commercial buildings, units can meet the cooling needs of large spaces and create a cool and comfortable shopping environment for people.In the convention center, the crew can provide a pleasant exchange environment for exhibitors and audiences to ensure the smooth progress of various activities.
Environmental protection vertical remote shooting air -conditioning units are a new type of air -conditioning equipment that uses remote transmission technology and shooting technology, which can achieve long -distance air supply and rapid cooling.Specifically, this kind of air -conditioning unit can achieve remote control and monitoring through cloud control, and facilitate management and maintenance.At the same time, it adopts a shot technology to extend the air supply distance to more than 30 meters to achieve rapid adjustment of the indoor environment.
The installation of environmentally friendly vertical remote air -conditioning units is a relatively complicated process that needs to follow a series of requirements and steps to ensure its normal operation and efficient performance.The following are some key installation requirements:
Position selection: Select a position that is good and easy to maintain, stay away from thermal sources and obstacles, and ensure that there is enough space around the unit, so that the air can flow smoothly and avoid affecting the cooling effect.At the same time, the position of power and water must be considered in order to connect the pipeline.
Basic preparation: Clean up the ground and make a solid foundation based on the data provided by the manufacturer.The foundation should be flat and solid, and can withstand the weight and vibration of the crew.Persons may require foundation.
Equipment unloading and inspection: Be careful of the boxing, check whether the parts are intact.It usually includes hosting, pipelines, controllers, etc.Make sure that all components are complete, no damage or lack.
Host installation: Place the host on the basis according to the manual to ensure the level and fix it.Connect the power line and gas source, pay attention to the correctness and insulation of the wiring.
Pipeline installation: According to the design drawings, laid the refrigerant or water pipeline to connect the inlet and outlets.The installation of the pipeline should be reasonable to avoid excessive bending to reduce stress loss.At the same time, we must ensure that the pipeline connection is firm and reliable, and the leakage or air leakage should be avoided.
Controller installation: Install the controller in an easy -to -operate position and connect to the host and external equipment (such as the temperature controller).Ensure the accuracy and sensitivity of the controller.
Test operation: After the installation is completed, turn on the power supply for the test operation.Check whether all the connections are firm and running smoothly to ensure the work of the crew normally.