Environmental air curtain machines are widely used in shopping malls, restaurants, supermarkets, airports, warehouses, electronic instruments, textiles, pharmaceuticals, food plants, hospitals and other industries and places.Not only is it related to the overall beauty, it is also closely related to the functional protection, energy saving, dustproof, mosquito -separated and other functions of the weather curtain machine. Most of them are complaining that the air curtain machine is installed but the effect is not obvious.Incormed, the editor will briefly introduce the installation of the curtain machine.
1. The installation of the natural wind series and the electrical air curtain series are the same. As long as the positioning screws below the front of the fuselage, separate the fuselage from the bottom plate and then firmly fix the bottom plate on the door frame or wall (if if you If the wall (ifThe fixing is not tightly caused by vibration noise), hanging the body directly on the floor, and fixing the disassembly screw according to the original fixation on the bottom plate.Note: Do not miss rubber shocks when hanging up. In addition to the same models of the RFMS type installation, it is fixed with a connected hole. It is strictly forbidden to fix the bottom plate.Otherwise, it will cause mechanical jitter and noise. At the same time, it will affect the service life of the machine, and check whether the power supply voltage and the selected switching wire section are consistent with the installed windows.
2. The water heating curtain machine should be installed on the indoor side of the doors and windows to prevent freezing water in the plate of the heat exchanger.
3. According to the selection of different thermal media, it should be equipped with the corresponding water drainage pipeline, and the pipeline is used for heat preservation. When the hot water is the media, the lower part will enter the water and return to the water.The automatic airworthiness valve should be installed at a high place.
4. Use hot water as the heat media, use soft water.
5. Each time the water heating cleansing machine work, the water exchange device should be discharged first, or mixed the gas, preheat for 10 minutes, and then turn on the hot curtain machine (air curtain).At this time, the water in the tray must be exhausted.
6. When working in winter, the water -warming off the curtain machine requires that thermal energy can be provided continuously or regularly to ensure the working state of the curtain machine.
7. Extend the service life of the motor, and do not allow only heating, and do not start the working method of the fan.
The above is the installation method of the water warm curtain machine and the matters that need attention. If you want to learn more about information, please pay more attention to us- ——