Design and installation steps and precautions forsphalt c

Views :
Update time : 2024-06-23

1. After the first asphalt tank is designed and installed, you must not forget the inspection link. The first is to check whether each part of the equipment is connected correctly, especially the inspection of the line wiring.Secondly, whether the components are tightened and whether they are fixed firmly, it is determined that the phenomenon of looseness cannot be released.Then whether the rotating part is flexible and whether the transmission between the pipeline is unblocked.There is also a very critical point is the power supply. The power supply used during construction can choose a special power supply, so as to ensure the safe operation of the equipment.
2. When using it for the first time, after the asphalt is installed, it is necessary to open the exhaust valve, so that the asphalt can enter the heater smoothly, and the water and oil can be heated evenly.
3. Before the asphalt tank equipment runs ignition, first check whether the water in the water tank is full, open the valve so that the water level in the steam generator reaches the prescribed height, and then close the valve.
4. During the design and installation and operation of the asphalt store, pay attention to observing the water level at any time. To ensure that the water can be used and adjust the valve according to the situation, so that the water level will always maintain an appropriate position.
5. If the asphalt in the tank itself contains moisture, you can open the top of the tank into the hole when the temperature reaches 100 degrees, and start the internal circulation dehydration.
6. Generally, after dehydration is taken, first observe the instructions of the temperature table, and discharge high -temperature asphalt in time. If the temperature is too high and does not require a large amount of asphalt, you should quickly start the internal circulation to cool down to ensure the aging and corrosion of asphalt.
7. When the asphalt liquid in the tank is lower than the temperature meter, close the suction valve before the asphalt pump stops to prevent the asphalt return in the heater.When the motor is turned on the next day, the three -way valves are opened.
The precautions for the design and installation of the asphalt can simply summarize the following points:
1. Clean the dirt of heating tanks. Wood chips should be delivered to the asphalt tank and wipe the bottom plate of the tank with a wood chip.You can also use sawdust to clean up dirt. After cleaning, sawdust can naturally weather.Then check whether the device transportation process and ventilation equipment installation is correct.
2. The treatment of drainage pipe drainage during the design and installation of the asphalt store, sewage is discharged into empty tanks or other containers through inlet and out of water pipes and self -drainage sewage.Sandy wells can be used to reduce the emissions of petroleum and natural gas.When manual pumping the bottom oil, you should choose the operation of two people to reduce the labor intensity of the workers.

Related News
Read More >>
Pipe connection method of air Pipe connection method of air
06 .18.2024
Air suspension fans are efficient, environmentally friendly ventilation equipmen
Installation and debugging of Installation and debugging of
06 .18.2024
Before installation: Before installation, first prepare the materials and tools
Advantages and adjustment meth Advantages and adjustment meth
06 .18.2024
A centrifugal fan is a mechanical device that relies on input mechanical energy
How to debug a centrifugal cur How to debug a centrifugal cur
06 .30.2024
The debugging of the centrifugal curtain machine mainly includes the following s

Leave Your Message