1. Do not use the emulsified asphalt equipment for manned, and it must not run overload during construction, or overload.
2. It is not allowed to stop under the equipment, walk around, and protect the protection.
3. During the equipment construction operation, the body is not allowed to expose the body out of the fence to surpass the scope of the protective fence.
Regarding the following nine steps requirements for equipment operation control:
1. When the modified emulsion asphalt equipment is operated in the workshop, the ventilation system device must be started.
2. Check the switch of the modified asphalt equipment and the switch of the instrument and instrument before starting the power.
3. Before starting, the solenoid valve will be manually checked to test the test, and automatic production can be performed after confirming that it is correct.
4. When cleaning the device, you must not use the asphalt pump reversal to clean the filter.
5. When the modified asphalt equipment is faulty for maintenance, the asphalt reserved in the pipes memory should be emptied first, and the temperature of the tank should be reduced to less than 45 degrees before the can to be repaired.
6. Check the location of the valve parts before the construction spray.The asphalt in the emulsification asphalt equipment can only reach a temperature of about 180 ° C before it can be used.
7. If the asphalt in the device is used with a burner, the asphalt height exceeds the plane of the burning chamber, otherwise the burning room will be burned out.
8. During the construction period, the asphalt cannot be filled too full.
9. There are two consoles before and after. When the console is used, the switch needs to be dialed to the front control. At this time
Do you understand the above?If you want to know more, please pay attention to us-