The installation and commissioning of fire -fighting smoke shafts includes the following steps:
installation steps:
1. Determine the installation location: According to the needs of the project and the fan specifications, select the appropriate installation location.Make sure the installation position is flat and firm, and does not affect the normal operation of other equipment.
2. Prepare tools and materials: Prepare the tools and materials required during the installation process, such as screwdrivers, wages, lubricants, etc.
3. Installation foundation: Make appropriate concrete foundation according to the size of the fan base.Ensure the basic level, stability, and solid connection with the building structure.
4. Install motor: Place the motor on the basis, adjust the height and horizontal degree of the motor to ensure that the motor is firmly connected with the foundation.
5. Install the blade: Install the leaves on the bearing seat to ensure that the leaf and the bearing seat are well coordinated and have no loose phenomenon.
6. Install the duct: connect the duct with the fan according to needs.Make sure that the air duct is firm and seal.
Debugging steps:
1. Open the fan: After the installation is completed, open the fan, check the rotation of the fan and move the blade with the hand to check whether it is stuck and friction.At the same time, check whether there are residues and other debris in the fan and adjacent pipelines.
2. Check the wind door: During the inspection, ensure that the wind door has been opened.
3. Check the power cord: Check whether the power cord is firmly connected, whether the current and voltage are stable, and confirm whether the circuit protection device such as leakage protection switch is installed is installed.
4. Check the rotation of fan blades: View the rotation direction of the fan blade is the same as the rotation mark.
5. Trial operation: After the inspection, the trial transportation fan is 10 ~ 30 minutes, and check whether the leaves and other parts are normal during the period.
6. Check and deliver again: Check the blade and confirm that everything is normal, open the fan again and deliver it.
Precautions:
Ensure that the fan is installed on the basis of horizontal and stable.
· During debugging, the staff should be close to the fan to ensure safety.
Pay special attention to whether the bolt of the seismic reduction seat and the top is softened, because the installation of the shock absorption system helps to attenuate the vibration of the machine itself and ensure the normal operating of the fan.
Please note that the above is only general steps and precautions. The specific installation and commissioning process may be different due to the different equipment models, specifications, and actual installation environment.Therefore, in actual operation, it is recommended to refer to the installation and debugging manual provided by the equipment manufacturer, and follow the relevant safety regulations.If you have any questions or questions, please contact professional engineers or related technicians to consult and guide.
The above is the installation and debugging of the fire discharge smoke shaft fans

Related News
Read More >>
Pipe connection method of air Pipe connection method of air
06 .18.2024
Air suspension fans are efficient, environmentally friendly ventilation equipmen
Installation and debugging of Installation and debugging of
06 .18.2024
Before installation: Before installation, first prepare the materials and tools
Advantages and adjustment meth Advantages and adjustment meth
06 .18.2024
A centrifugal fan is a mechanical device that relies on input mechanical energy
How to debug a centrifugal cur How to debug a centrifugal cur
06 .30.2024
The debugging of the centrifugal curtain machine mainly includes the following s

Leave Your Message